The cost of the 73-km Bengaluru Business Corridor Phase 1 has risen to ₹10,500 crore from the earlier ₹6,800–7,000 crore estimate, driven by...
BySamrita JosephApril 8, 2026NHAI has scrapped its proposed elevated corridor between Madhavaram and Nallur toll gate, citing Tamil Nadu’s non-cooperation. The congested 10.3 km stretch will...
BySamrita JosephOctober 27, 2025NHAI has launched a 14.64-km six-lane elevated highway connecting Aroor and Edappally in Kochi to ease traffic on NH-66, bypass key junctions, and...
BySamrita JosephOctober 22, 2025NHAI will construct an 18.4 km, Rs 3,300 crore elevated corridor between Urappakkam and Chettipunyam on Chennai’s GST Road, featuring India’s first integrated...
BySamrita JosephOctober 21, 2025Bulldozers rolled into Arumbakkam on Thursday as authorities began clearing encroachments along the Cooum River to make way for the long-delayed Port–Maduravoyal elevated...
ByKanmani ChokkalingamMay 16, 2025CMRL-State highway to build Double-Decker Flyover in Coimbatore the 3-kilometer section from Goldwins to Le Méridien Hotel will have operations of the metro rail...
ByKanmani ChokkalingamFebruary 13, 2025Chennai’s traffic woes on the GST Road are set to ease with the upcoming 18.4 km elevated corridor between Kalaignar Centenary Bus Terminus...
ByKanmani ChokkalingamFebruary 1, 2025It will be built at the Kamakshi Hospital junction, where the road meets Velachery- Tambaram Road, and will extend to Chennai One IT...
ByKanmani ChokkalingamJanuary 6, 2025