GST 2.0 is set to boost affordable housing with a 1% rate and reduced costs, but supply chain delays and rising labour costs...
BySamrita JosephSeptember 20, 2025Bengaluru to launch ₹18,000 crore, 110-km elevated corridor in December under PPP model. Project to ease traffic, boost airport access, and transform connectivity.
BySamrita JosephSeptember 19, 2025Bengaluru’s first double-decker flyover at Silk Board Junction is nearing full completion. The 5.5 km stretch, partially operational since November 2024, will fully...
BySamrita JosephSeptember 18, 2025Deputy CM D.K. Shivakumar, in a post on X, announced Rs 1,100 crore for Bengaluru road repairs and new works, ensuring smoother, pothole-free...
BySamrita JosephSeptember 16, 2025Chennai residents urge the Greater Chennai Corporation to expedite incomplete flyover projects at Usman Road, Sannathi Street, and Ganesapuram to prevent flooding and...
BySamrita JosephSeptember 15, 2025The ₹621 crore, 3.2-km elevated corridor on Anna Salai above Chennai Metro tunnels has crossed 30% completion, with foundation works set to finish...
BySamrita JosephSeptember 12, 2025The Centre is preparing a ₹16,000 crore incentive scheme to boost domestic manufacturing of construction equipment, including tunnel boring machines and cranes. The...
BySamrita JosephSeptember 9, 2025On Saturday, September 6, senior officials of the Chennai Metro Rail Limited (CMRL) and the National Highways Authority of India (NHAI) jointly inspected...
ByKanmani ChokkalingamSeptember 8, 2025The National Highways Authority of India (NHAI) is getting ready for the very first multi-lane free flow (MLFF) tolling system in the country,...
ByKanmani ChokkalingamSeptember 3, 2025According to the officials from the National Highways Authority of India (NHAI,) works on the six-lane upgrade of a stretch of the 36.08...
ByKanmani ChokkalingamSeptember 2, 2025