Chennai Metro’s Vadapalani to Poonamallee Bypass stretch has successfully completed final safety inspection, bringing the much awaited Corridor 4 Phase II closer to...
BySamrita JosephFebruary 27, 2026Chennai Metro Rail Limited is set to conduct the final speed trial on the Vadapalani to Poonthamalli Bypass stretch of Corridor 4 Phase...
BySamrita JosephFebruary 14, 2026Chennai Metro Phase II has reached 49 percent completion, with the Centre releasing Rs 10,354.15 crore for the 118.9 km expansion project, strengthening...
BySamrita JosephFebruary 11, 2026Chennai Metro Rail’s Phase II Corridor 4 is progressing steadily, with the Vadapalani–Panagal Park stretch targeted for opening by March 2027, improving access...
BySamrita JosephFebruary 3, 2026Chennai Metro Rail’s Phase II services on the Poonamallee–Vadapalani stretch have moved a step closer to launch after receiving Railway Board approval, with...
BySamrita JosephJanuary 21, 2026Chennai Metro Rail’s successful trial run between Porur and Vadapalani marks a key milestone in Corridor IV, bringing faster, seamless connectivity closer for...
BySamrita JosephJanuary 13, 2026Chennai Metro Rail Limited plans retail, dining, parking and public spaces at select Phase 2 Corridor 4 stations to boost ridership and ticket-independent...
BySamrita JosephJanuary 6, 2026Chennai Metro Rail is accelerating Phase II works on the Vadapalani–Poonamallee corridor, with trial runs targeted by mid-January and commercial operations expected soon.
BySamrita JosephJanuary 2, 2026Chennai Metro Phase II tunnelling begins on Thiruvanmiyur–Indira Nagar stretch. Twin TBMs will carve 650 metres of granite tunnels. Cutterhead maintenance may extend...
BySamrita JosephOctober 6, 2025Chennai Metro recorded over 1.01 crore passengers in September 2025, with the highest single-day ridership of 3.97 lakh on September 4. CMRL continues...
BySamrita JosephOctober 3, 2025